{"id":1389,"date":"2025-06-22T16:00:33","date_gmt":"2025-06-22T16:00:33","guid":{"rendered":"https:\/\/minsaad.junlasys.com\/?post_type=sub-project&#038;p=1389"},"modified":"2025-06-22T20:17:19","modified_gmt":"2025-06-22T20:17:19","slug":"construction-of-talaguba-bridge","status":"publish","type":"sub-project","link":"https:\/\/minsaad.junlasys.com\/index.php\/sub-project\/construction-of-talaguba-bridge\/","title":{"rendered":"Construction of Talaguba Bridge"},"content":{"rendered":"<p><strong>RATIONALE OF THE SUBPROJECT:\u00a0<\/strong><\/p>\n<p>The identified problems in the ARC are as follows; poor and dilapidated roads which are impassable during rainy seasons, high price of farm inputs and other services, high transportation costs, soil erosion, low price of corn and other farm products, low income of farmers, low yield of cash crops, inadequate water supply and slow economic growth and its opportunities are the following; implementation of DAR-MinSAAD, support from the Provincial Government and other National Agencies. The proposed project covers the total length of 18m. The existing RCDC overflows and not passable during heavy rains. The existing RCDC was built at the sharp curve and it\u2019s difficult for the wheeler trucks to maneuver. With the implementation of this sub-project the beneficiaries will have an easy access and a shorter travel time.<\/p>\n","protected":false},"featured_media":1391,"template":"","financial-status":[96,97,98],"project-area":[90],"sub-project-type":[54],"class_list":["post-1389","sub-project","type-sub-project","status-publish","has-post-thumbnail","hentry","financial-status-cash-released","financial-status-caw-1-and-caw-2","financial-status-contract-cost","project-area-cabadiangan","sub-project-type-bridge"],"acf":{"sub-project_id":"16-5050504001-001","quantity":257.06,"beneficiaries":"","project_status":"Turned-Over","event_approved":"SAC","event_number_approved":"7th","date_approved":"20160714","target_date_start":"20170707","actual_date_started":"20170707","target_date_completion":"20171119","actual_date_completed":"20171130","date_turned-over":"20180206","date_terminated":null,"date_cancelled":null,"lp_cost":8365259.02,"gop_cost":719025.8,"minsaad_cost":9084284.82,"lgu_cost":0,"arbo_cost":"","others_cost":"","total_project_cost":9084284.82,"target_project_duration":135,"actual_project_duration":146,"exceed_days_from_target_duration":11,"implementing_unit":["DPWH"],"mode_of_implementation":"by Contract","contractor":"Jorviv's Construction Corporation\/Kiokong Construction","coordinates":"7.506842, 124.820048","pre-implementation_picture_1":1397,"pre-implementation_picture_2":1398,"pre-implementation_picture_3":1399,"pre-implementation_picture_4":1400,"ongoing_picture_1":"","ongoing_picture_2":null,"ongoing_picture_3":null,"ongoing_picture_4":null,"completed_picture_1":1403,"completed_picture_2":"","completed_picture_3":null,"completed_picture_4":null,"turned-over_picture_1":1402,"turned-over_picture_2":"","turned-over_picture_3":"","turned-over_picture_4":null,"sub-project_proposal_url":"https:\/\/minsaad.junlasys.com\/wp-content\/uploads\/2025\/06\/2A-AF.pdf","sub-project_completion_report_url":"","municipality_and_province":"Kadingilan, Bukidnon, Region X"},"_links":{"self":[{"href":"https:\/\/minsaad.junlasys.com\/index.php\/wp-json\/wp\/v2\/sub-project\/1389","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/minsaad.junlasys.com\/index.php\/wp-json\/wp\/v2\/sub-project"}],"about":[{"href":"https:\/\/minsaad.junlasys.com\/index.php\/wp-json\/wp\/v2\/types\/sub-project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/minsaad.junlasys.com\/index.php\/wp-json\/wp\/v2\/media\/1391"}],"wp:attachment":[{"href":"https:\/\/minsaad.junlasys.com\/index.php\/wp-json\/wp\/v2\/media?parent=1389"}],"wp:term":[{"taxonomy":"financial-status","embeddable":true,"href":"https:\/\/minsaad.junlasys.com\/index.php\/wp-json\/wp\/v2\/financial-status?post=1389"},{"taxonomy":"project-area","embeddable":true,"href":"https:\/\/minsaad.junlasys.com\/index.php\/wp-json\/wp\/v2\/project-area?post=1389"},{"taxonomy":"sub-project-type","embeddable":true,"href":"https:\/\/minsaad.junlasys.com\/index.php\/wp-json\/wp\/v2\/sub-project-type?post=1389"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}